CMC SUBSIDIARY AND TAKE-OVER CENTERS

Cocoa Marketing Company (UK) Ltd.

The head office of CMC is located in Cocoa House, Accra. It has Take-Over centers in Tema, Kumasi and Takoradi, to facilitate its operations.


TEMA

The Tema (Seaport) Take-Over Center has a total warehouse capacity of about 225,200 Metric Tonnes.
Shipping operations performed at the Tema Take-Over Center include:

  1. Break Bulk
  2. Bags-in-container
  3. Coventional Loading
  4. Bulk in Containers
Other Special operations carried out here include: Descrepant Cocoa Operations.


TAKORADI

The Takoradi (Seaport) Take-Over Center has a total warehouse capacity of about 233,000 Metric Tonnes.
Shipping operations performed at the Takoradi Take-Over Center include:

  1. Break Bulk
  2. Bags-in-container
  3. Coventional Loading
  4. Bulk in Containers
  5. Mega Bulk
Other Special operations carried out here include: Descrepant Cocoa Operations.


KUMASI

The Kumasi (Inland Port) Take-Over Center has a total warehouse capacity of about 67,000 Metric Tonnes.
Shipping operations performed at the Kumasi Take-Over Center include:

  1. Bags-in-container
  2. Coventional Loading
Other Special operations carried out here include: Descrepant Cocoa Operations and Trucking.